Some of our varied case studies

Gindi Towers TLV

  • CCTV cameras
  • Access control
  • building and AC control
https://gindi.com/en/

Weizmann Institute

https://www.weizmann.ac.il/pages/about-institute

Map of facility https://map.weizmann.ac.il/

Control in every single building

  • lighting
  • HVAC
  • Electricity Control
  • Building Control
  • Access Control
  • Energy Counters
  • Much More

All systems are controlled by the HMI (Machine Human Interface) system which allows monitoring of the systems Monitoring analysis and reporting of the collected control data, at different levels according to prior authorization.

One of these projects is the Immunisations project, The Immunisation lab is the largest research structure in the Middle East for clinical research. In this structure, researchers are working on very important studies and the control project needs to be carried out with highest level of skill and precision while integrating with other control systems.

The project has about 5000 control points in about 100 different controllers in TCP/IP connectivity to the ETERNET network.

The project is controlled through the HMI PCIM system.


Mitzpai Hayamim

  • Room control
  • Access control
  • swimming pool control
  • reports to the Ministry of Health
https://www.mizpe-hayamim.co.il/

IAI – Natbag

https://www.iaa.gov.il/en-us/airports/bengurion/pages/about.aspx

  • Navigation Equipment Control
  • standard AC
  • Building Control

In every landing / departure procedure, about a 100 systems are involved.This special project, is monitoring and control 5 of them.

The Navigation Aids Sites Control System includes:

  • VOR - Direction indication.
  • DME – Distance indication.
  • ILS – Landing angle and runway center point.
  • NDB – General direction.
  • DF – An opening direction for a transmission plane.

The control system displays the equipment and machines status as well as alarms. It is also possible to enable / disable the varied equipment via the HMI which is in the main control room in BGU.



Waldorf Astoria Hotel

New 900 million NIS building project aimed at bringing a premium brand hotel chain to Israel.

Brought in at the last minute following the collapse of one of the contractors and key product suppliers, LCS provided the experience and knowhow to install intelligent building controls in the hotel.

https://www.hilton.com/en/hotels/jrswawa-waldorf-astoria-jerusalem/

The project was divided into two parts:

Part 1:
Room management.

Design and install room control equipment to enhance guest comfort. (Inncom)

By offering greater control & creating predefined comfort settings for light and air-conditioning that can be pre-activated and changed for different users of the room we are able to enhance the overall comfort and guest experience. With I-pads in each room, guests could remotely control all settings in the room – regardless of where they are in the hotel.

Through connecting the door lock system and directly linking the HMI system into the hotel Fidelio software package, the hotel could create different lighting and HVAC entrance settings for guests and hotel staff – thereby enhancing further the guest’s comfort level whilst also creating further energy savings.

Part 2:
Building Management

Oversee the design and installation of building automation and control for core building functions; electricity, water, HVAC, fire & smoke systems.

By designing the system to the client’s specific needs and requirements, we were able to offer centralized and remote monitoring, advance warning of system faults and intelligent systems capable of reacting to the needs of the hotel & its guests. The system was not only easy to maintain but created cost efficiencies and had a short payback period.


Sourasky Medical Centre (Ichilov)

An established and long term client, the Tel Aviv Sourasky Medical Center (Ichilov) is the second largest and one of the most progressive full-service health care treatment and research institutions in Israel.

Project 1:
Building automation and control

Planning and installation of building automation and control systems for the new cardiology building. The solution encompassed critical and sensitive areas such as the Children A&E centre, as well as the research laboratory for Immunotherapy.

The BMS system covered:

  • Machine room automation
  • HVAC
  • Fire and Safety
  • Gas management

Project 2:
Emergency Evacuation Solution

In order to combat potential fire and safety risks that would require the evacuation of the building, the hospital installed emergency external diesel operated elevators on the roof of the Sami Ofer building.

Designed to enable quick and easy evacuation of the elderly, sick and immobile patients in case of a fire emergency, Emergency Rescue Systems hired LCS to install intelligent Swiss made SBC controllers in order to manage the operation of the lift. Situated on the roof of the building, the lift needs to come into operation immediately, and LCS technology ensures the crucial hardware comes into operation with winches lifting the elevator of the roof and